NH-44 |
6 laning of existing 4 lane stretch from Kalkallu at Km. 454.000 to GundlaPochanpally at Km 471.000 on Nagpur -Hyderabad Section (Design Length 17.000 Km) of NH-44 in the State of Telangana under Bharatmala Pariyojana on EPC Mode |
NHAI |
Telangana |
534 Cr |
22 Jan, 2025 |
NH-44 |
6 - laning of existing 4 lane from Km 22.300 (Thondupally) to Km 34.144 (Kothur) (Design Length = 11.844 Km) on Hyderabad – Bangalore Section of NH-44 in state of Telangana under Bharatmala Pariyojana Phase on EPC Mode |
NHAI |
Telangana |
311 Cr |
15 Aug, 2024 |
NH-44 |
periodical Renewal of balance section of the project stretch including construction of service road / slip road along with drain from Km 211.000 to Km 462.164 on Hyderabad - Bangalore section of NH 44 |
NHAI |
Hyderabad - Bangalore |
182 Cr |
22 Apr, 2023 |
NH-44 |
6 laning of existing 4-lane stretch of NH-44 from Gundlapochampally (Design chainage Km 471.300) to Bowenpally (Design chainage Km 481.331) total length 10.031 Km, in the State of Telangana on EPC mode under Bharatmala |
NHAI |
Telangana |
401 Cr |
31 July, 2024 |
NH-754K |
LIDIPL Has Been Awarded Construction Of 6 Lane Access Controlled Greenfield Highway Package-6 From Km 125+000 To 150+000, Deogarh (Near Dhandaniya) - Rajasthan/ Gujarat Border Section Of NH-754k In The State Of Rajasthan On EPC Mode |
NHAI |
Rajasthan |
561 Cr |
11 Aug, 2023 |
NH-754K |
LIDIPL Has Been Awarded Construction Of 6 Lane Access Controlled Greenfield Highway Package-7 From Km 150+000 To 180+000, Deogarh (Near Dhandaniya) - Rajasthan/ Gujarat Border Section Of NH-754k In The State Of Rajasthan On EPC Mode |
NHAI |
Rajasthan |
415.50 Cr |
15 July, 2023 |
NH-754K |
LIDIPL Has Been Awarded Construction Of 6 Lane Access Controlled Greenfield Highway Package-4 From Km 72+000 To 97+000, Deogarh (Near Dhandaniya) - Rajasthan/ Gujarat Border Section Of NH-754k In The State Of Rajasthan On EPC Mode (Rs.379.42 Crores) |
NHAI |
Rajasthan |
379.42 Cr |
30 Nov, 2022 |