Four-Laning of NH-716 from Kadapa (Junction with Kadapa Bypass Road) (Design Km 0.000/Existing Km 260.652 of NH-716) to Chinna Orampadu (Design Km 64.200 / Existing km 196.125) (Design Length = 64.200 Km) (Package-1) on HAM under Bharatmala Pariyojna in the state of Andhra Pradesh - 1222.11 Cr
Construction of Four-Laning of NH-716 from Chinna Orampadu (Design Km 64.200/ Existing km 196.125 of NH-716) to Renigunta on NH 565 near Tirupati Airport Road (Design Km 121.935 / Existing km 137.000) (Design Length = 57.735 Km) on HAM under Bharatmala Pariyojna in the state of Andhra Pradesh (Package-II) - 1032.32 Cr